Solar Panel Installation in
El Paso & Las Cruces

When you sign up for solar with Sunshine City, your system is typically installed within 45 days and activated within 60. We are the area's premier turnkey solar company as we will guide you through system design, financing, permitting, installation, and activation! Make the change with one of our local, honest, experts today.  

 

A brief overview of our process for installing your solar panels:

1. Assessment

 

Our team will review your home's energy usage and assess the property's sun exposure before designing a custom solar plan for your home that maximizes your immediate and long-term savings.

2. Consultation

 

Next, you’ll meet with one of our solar experts for an honest comparison of our solar options to your current arrangement with El Paso Electric. We will address any questions you may have, and help you decide if solar energy is right for you.

3. Permitting

 

Our team will then work with the city and the local utility to process all permits required for the installation of your solar system.

4. Installation 

 

Our systems are typically installed within 45 days from the day you sign up to go solar.

5. Activation

 

Finally, El Paso Electric will inspect your solar power system before granting Permission to Operate (PTO). PTO is typically granted within 2 weeks of system installation, or 60 days after signing up for solar. Occasionally, delays with inspectors can cause PTO to be pushed out as far as ninety days from sign up. Once PTO is granted, your system will be activated and begin producing electricity for your home.

If you’re ready for your free estimate, or if you have any questions about getting started with solar power, connect with a Solar Specialist today.
500 N. Oregon, Second Floor
El Paso, TX 79901
  • Black Facebook Icon
  • Black Instagram Icon
Copyright © 2020 by Sunshine City Power Company. All Rights Reserved.